(1)
Fauzan , F. .; Azra’i, A.; Subhan, S.; Teuku, H.; Eko, E. Load Switching Scada-Based on Three-Phase 15 MW And 20 MW Synchronous Generators. J. Adv. Res. Appl. Mech. 2024, 122, 175-185.