[1]
Muhamad Syakir Kamis, Muhamad Faiz Abd Latif, Mimi Faisyalini Ramli, Reventheran Ganasan, Mohd Asran Shamsuddin, Mohd Eizzuddin Mahyeddin and Nadia Amena Iskandar 2024. Determination of OCS Mast Offset in Johore Bahru Sentral for Gemas-Johor Electrified Double Track Project. Journal of Advanced Research in Applied Sciences and Engineering Technology. 44, 2 (Apr. 2024), 184–198. DOI:https://doi.org/10.37934/araset.44.2.184198.