Muhamad Syakir Kamis, Muhamad Faiz Abd Latif, Mimi Faisyalini Ramli, Reventheran Ganasan, Mohd Asran Shamsuddin, Mohd Eizzuddin Mahyeddin, & Nadia Amena Iskandar. (2024). Determination of OCS Mast Offset in Johore Bahru Sentral for Gemas-Johor Electrified Double Track Project. Journal of Advanced Research in Applied Sciences and Engineering Technology, 44(2), 184–198. https://doi.org/10.37934/araset.44.2.184198