[1]
Srikanth Gundurouthula, M. Gopal Naik, and Togiti Dhilip, “Construction Delay Assessment using Compound Index and Fuzzy Optimization Technique: A Case Study of Hyderabad Construction Industry”, J. Adv. Res. Appl. Sci. Eng. Tech., vol. 34, no. 2, pp. 30–49, Dec. 2023.