Techno-Economic Evaluations: An Innovative of Hydraulic Reaction Turbine for Pico-Hydro Generation System

Authors

  • Nurul Ashikin Mohd Rais Faculty of Electrical and Electronic Engineering Technology, Universiti Teknikal Malaysia Melaka, Hang Tuah Jaya, 76100 Durian Tunggal, Melaka, Malaysia
  • Mohd Farriz Basar Faculty of Electrical and Electronic Engineering Technology, Universiti Teknikal Malaysia Melaka, Hang Tuah Jaya, 76100 Durian Tunggal, Melaka, Malaysia
  • Shamsul Fakhar Abd Gani Faculty of Electrical and Electronic Engineering Technology, Universiti Teknikal Malaysia Melaka, Hang Tuah Jaya, 76100 Durian Tunggal, Melaka, Malaysia
  • Wan Azani Mustafa Faculty of Electrical Engineering Technology, Universiti Malaysia Perlis (UniMAP), Pauh Putra Campus, Arau, 02600, Malaysia

DOI:

https://doi.org/10.37934/arfmts.90.2.919

Keywords:

Low-head, low-flow, techno-economic, pico-hydro, CPT, SRT

Abstract

The primary goal of this paper is to evaluate an innovative Z-Blade turbine technology and its potential implications for production costs and manufacturing techniques. From literatures, conventional pico-hydro technologies with a capability of less than 5kW are getting more and more attention as good alternatives to environmentally friendly power generation, but there are more expensive and complex for small power generation and small domestic consumer level. Therefore, a Z-Blade reaction turbine technical and environmental processes as well as financial research are described in-depth. The methods for a Z-blade turbine design and implementation are described here, and also the material using for the Z-Blade turbine is a grey PVC pipe. Moreover, empirical description, designation, costing, and correlation are employed in the process of critically analysing the simple reaction water turbine novels. Also in this article, the manufacture of the Split Reaction Turbine (SRT) and Cross Pipe Turbine (CPT) was re-evaluated to take into consideration the technological and economic factors as well as the difficulties of both turbines. In the meantime, low-head, low-flow water resources used to examine additional features of Z-Blade. Theoretically, such a platform for hydro production is cost - effective and has a simplistic design methodology with a total cost of USD76 that equates to 7.6% of the overall installation cost and worthy of output up to 115W of mechanical energy.

Downloads

Download data is not yet available.

Author Biographies

Nurul Ashikin Mohd Rais, Faculty of Electrical and Electronic Engineering Technology, Universiti Teknikal Malaysia Melaka, Hang Tuah Jaya, 76100 Durian Tunggal, Melaka, Malaysia

nurulashikin@utem.edu.my

Mohd Farriz Basar, Faculty of Electrical and Electronic Engineering Technology, Universiti Teknikal Malaysia Melaka, Hang Tuah Jaya, 76100 Durian Tunggal, Melaka, Malaysia

mfarriz@utem.edu.my

Shamsul Fakhar Abd Gani, Faculty of Electrical and Electronic Engineering Technology, Universiti Teknikal Malaysia Melaka, Hang Tuah Jaya, 76100 Durian Tunggal, Melaka, Malaysia

shamsulfakhar@utem.edu.my

Wan Azani Mustafa, Faculty of Electrical Engineering Technology, Universiti Malaysia Perlis (UniMAP), Pauh Putra Campus, Arau, 02600, Malaysia

azani.mustafa@gmail.com

Downloads

Published

2021-12-27

How to Cite

Mohd Rais, N. A. ., Mohd Farriz Basar, Abd Gani, S. F. ., & Wan Azani Mustafa. (2021). Techno-Economic Evaluations: An Innovative of Hydraulic Reaction Turbine for Pico-Hydro Generation System. Journal of Advanced Research in Fluid Mechanics and Thermal Sciences, 90(2), 9–19. https://doi.org/10.37934/arfmts.90.2.919

Issue

Section

Articles

Most read articles by the same author(s)

<< < 1 2